Lower
09/07/2025

Erith Reach - Erith Oil Works - Lifting Operations

Download Notice
Download this notice for printing or offline use
PDF Download
Notice RefL54-25
IssuerMichael Spice
Issuer RoleDeputy Harbour Master
Issue Date09/07/2025
Expiration Date22/07/2025
DistrictLower
Reach(es)Erith Reach

Mariners are advised that on or about Thursday 10th July contractors instructed by ADM Erith Ltd will commence operations at Erith Oil Works, Erith Reach.  Operations are to be undertaken between the hours of 0800 and 1700hrs on weekdays only, with works expected to take no longer than working 10 days. 

The general location of the works is indicated by the red box on the chartlet below: 


These works will involve the Crane Barge “Thames Transporter” and will include lifting and rigging operations, with Tugs and support boats in attendance when required. 

 Requirements to proceed with caution or at slow speed will be made in accordance with the procedure set out in the Port of London Authority’s Port Information Guide, under ‘Speed Reductions’. 

 

Romeo Yankee

The display of these signals will be in addition to any lights or shapes required under local regulations and the International Regulations for Preventing Collisions at Sea. 

Further details will be broadcast by London VTS on VHF Channel 14.  

© 2025 Port of London Authority